Release notes: version 3.6

New Features

  1. Comments Synchronisation.

  2. Watchers Synchronisation.

  3. Password protection for project settings (this is only for preventing accidental changes in the mappings; an experienced MS Project user will still be able to remove the password).

  4. Synchronisation of the Tempo Team attributes.

  5. An option to insert sub-tasks after parent tasks during import without making them children in MS Project.

Improvements

  1. Escape the "[", "]" and list separator characters in user names when importing resources.

  2. Ignore duplicated link types if they are not used in mappings (this was generating an error before).

  3. The command-line utility mspjb.exe exits with a non-zero code if there was an error during execution.

Bugs fixed

  1. Link, Sub-task or Epic Link synchronisation could fail if some parent tasks were collapsed.

Other changes

  1. Support for JIRA 5 and older has been discontinued. Please use Ceptah Bridge 3.5.8 for these versions of JIRA.