-
Importing all users from a selected group or all users who have access to a particular project.
-
The name of the last file the mappings were loaded from is displayed at the top of the Project Settings window.
-
An option to ignore work log entries after the project Status Date.
-
A command to toggle direction for all mappings at the same time (under the Advanced button in the menu of the mappings window).
-
An option to ignore and preserve assignments for non-work (cost and material) resources.