Release notes: version 2.3.2

Improvements

  1. The Duration field is added to the list of MS Project fields in the Remaining Estimate mapping. The Duration value is converted from the JIRA estimate value correctly now.

Bugs fixed

  1. "The parametervalue must be between '0' and '3579139.40666667'. Parameter name: paragraphWidth." error on some computers when configuring issue links.
  2. Null reference exception when the linked issues were not mapped to a task (in the predecessors mode).
  3. Spaces in the issue key field were treated as an issue key and a new issue for the task was not created.
  4. "An item with the same key has already been added" error when multiple tasks were mapped to the same issue.
  5. A JQL error was raised during import from a JIRA project when the project key was a reserved JQL word (e.g. OR, NEXT, etc.) and the number of issues exceeded 100.